
Multi Energy Development Pvt. Ltd. is the developer of Langtang Hydroelectric Project (30 MW), situated at Rasuwa district. This hydropower project runs under the RM Group Umbrella. RM Group is a team of versatile and prominent business leaders involved in multiples business ventures, having joined hands to converge their time and resources with a vision for Sustainable tomorrow by supporting the nation through developing clean hydroelectric power projects for our country and our Nepalese people. RM Group is led by Mr. Krishna Acharya, involved in multiple business ventures, having joined hands to converge their time and resources with a vision to generate 500MW within the span of 10 years in Nepal. Multi Energy Development Pvt. Ltd. is established on 2061/10/27 with the mission to produce electricity at Gosainkunda Rural Municipality ward no. 5 (Previous Syaphru VDC), Rasuwa District, State no. 3 Nepal. The proposed headworks site is decided about 20 m below the confluence of Langtang and Gupche Khola with principal headrace tunnel alignment passing through the left bank and powerhouse being located on the left bank of the Bhotekhosi River.
Objectives of the Company